Tag: critical path

  • Distributed Systems – Latency Limits (Notes)

    Introduction

    Summary

    Lamport’s theories provided deterministic execution for non determinism exists due to vagaries of the network. Will discuss techniques to make OS efficient for network communication (interface to kernel and inside the kernel network protocol stack)

    Latency Quiz

    Summary

    What’s the difference between latency and throughput. Latency is 1 minute and throughput is 5 per minute (reminds of me pipelining from graduate introduction to operating systems as well as high performance computing architecture). Key idea: throughput is not the inverse of latency.

    Latency vs Throughput

    Summary

    Key Words: Latency, Throughput, RPC, Bandwidth

    Definitions of latency is elapsed time for event and throughput are the number of events per unit time, measured by bandwidth. As OS designers, we want to limit the latency for communication

    Components of RPC Latency

    The five components of RPC: client call, controller latency, time on wire, interrupt handling, server setup to execute call

    Summary

    There are five sources of latency with RPC: client call, controller latency, time on wire, interrupt handling, server setup and execute call (and then the same costs in reverse, in the return path)

    Sources of Overhead on RPC

    Sources of overhead include: marshaling, data copying, control transfer, protocol processing

    Summary

    Although the client thinks the RPC call looks like a normal procedure, there’s much more overhead: marshaling, data copying, control transfer, protocol processing. So, how do we limit the overhead? By leveraging hardware (more on this next)

    Marshaling and Data Copying

    There are three copies: client stub, kernel buffer, DMA to controller

    Summary

    Key Words: Marshaling, RPC message, DMA

    During the client RPC call, the message is copied three times. First, from stack to RPC message; second from RPC message into kernel buffer; third, from kernel buffer (via DMA) to the network controller. How can we avoid this? One approach (and there are others, discussed in the next video, hopefully) is to install the client stub directly in the kernel, creating the client stub during instantiation. Trade offs? Well, kernel would need to trust the RPC client, that’s for sure

    Marshaling and Data Copying (continued)

    Reducing copies by 1) Marshal into kernel buffer directlry or 2) Shared descriptors between client stub and kernel

    Summary

    Key Words: Shared descriptors

    An alternative to placing the client stub in the kernel, the client stub instead can provide some additional metadata (in the form of shared descriptors) and this allows the client to avoid converting the stack arguments into an RPC packet. The shared descriptors are basically TLV (i.e. type, length, value) and provides enough information for the kernel to DMA the data to the network controller. To me, this feels a lot like the strategy that the Xen Hypervisor employs for ring buffers for communicating between guest VM and kernel

    Control Transfer

    Only two control transfers in the critical path, so we can reduce down to one

    Summary

    Key Words: Critical Path

    This is the second source of overhead. Bsaically have four context switches, one in the client (client to kernel), two in the server (for kernel to call server app, and then from server app out to kernel), and one final switch from kernel back to client (the response)

    The professor mentions “critical path” a couple times, but not sure what he means by that (thanks to my classmates, they answered my question in a Piazza Post: the critical path refers to the network transactions that cannot be run parallel and the length of the critical path is the number of network transactions that must be run sequentially (or how long it takes in wall time)

    Control Transfer (continued)

    Summary

    We can eliminate a context switch on the client side, by making sure the client spins instead of switching (we had switched before in make good use of the CPU)

    Protocol Processing

    How to reduce latency at the transport layer

    Summary

    Assuming that RPC runs over lan, we can eliminate latency (but trading off reliability) by not using acknowledgements, relying on the underlying hardware to perform checksums, eliminating buffering (for retransmissions)

    Protocol Processing (continued)

    Summary

    Eliminate client buffer and overlap server side buffering

    Conclusion

    Summary

    Reduce total latency between client and server by reducing number of copies, reducing number of context switches, and making protocol lean and mean